Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 544 A total investment of 400 million

The moving process was still very smooth.

Although the family was worth a lot of money and had a lot of things to do when moving the house, it was a waste of time, but Sun Wei couldn't help but pull five big trucks at noon - not military vehicles, but probably they were large trucks borrowed from a partner unit.

Now only a few people know the main purpose of building a mineral water plant. Mr. Basangjianzan was very strict, and even his son and daughter-in-law didn't know it. Therefore, Tibetans, including the villagers of the Obacuo, only knew that the partner of the mineral water plant wanted to build the factory to produce mineral water as soon as possible and sell it to make money, but they didn't know that the partner was actually the military.

It is no wonder that just around 60 kilometers east of Obacuo, there is a famous mineral water plant - the 5100 Plateau Glacier Mineral Water Plant.

The high-end mineral water produced by that factory has a very famous name - 5100 mineral water.

In 2005, the 5100 Glacier Mineral Water Plant was established in Chongga Village, north of Are Wetland. This water plant located below Kangma Temple gradually developed into a comparable brand of high-end mineral water in the following sixteen years, but it made a lot of money.

Since 5100 mineral water can make so much money, the villagers of Obacuo also have great hopes for establishing a mineral water plant here. Of course, the villagers of Obacuo also hope that a mineral water plant can make a lot of money will appear on their territory.

Therefore, the villagers of Yubacuo have no doubts about the so-called reason why the partners are eager to build factories and causing them to move in advance.

Besides, the moving days were originally scheduled for these few days, but it was just a few days earlier than the scheduled days.

With the help of five large trucks and dozens of people, all the 18 villagers in Yubacuo were moved in just three days.

The new house is right next to the Immigration New Village, all of which are two-story Tibetan-style buildings with courtyards. They are not small in size and are beautiful. Compared with the bungalows of the villagers of Obacuo before, these new houses are simply villas.

If the only thing that makes the villagers not very adaptable is the lack of cattle pens and sheep pens...

But that doesn’t matter. The villagers of Obacuo now do not expect to make money by raising cattle and sheep. Every year, the dividends from the mutual aid company alone are much more than those from raising cattle and sheep. Not to mention that the villagers of Obacuo are mostly working in the mutual aid companies, catering companies, and ecological animal husbandry, and earn five or six thousand yuan a month.

Moreover, every villager in the Russian Bacuo family has someone who does small businesses on their own in the tourism project, and they make more than 70,000 or 80,000 yuan a year.

To put it in an online sentence, we are driving Maybach, who wants any other bicycle...

Sun Wei and the others were also very quick. As soon as the villagers of Obacuo moved their house, various machinery came up there.

Excavators, loaders, pile drivers... In just a few days, the village of Obacuo disappeared, replaced by a flat and fenced area surrounded by isolated sight.

There is no way to have such a speed. Who made Sun Wei bring over all the construction teams that are serious engineers!

Since the mineral water plant was established, Sun Wei has become the highest leader here, and he is the leader in the construction of the mineral water plant.

Because there is a fence blocking the view, and the old man Basang Jianzan also specifically told him not to go there if he has nothing to do, so no one is idle and go there to go there if he has nothing to do.

As the time approached October 1, the number of tourists began to increase again, so early in the morning that day, Liu Mo'ang was pulled by Sun Wei to Babixiong.

"Brother Liu, it's time for your white lion and bun to pull the wild snow leopard away. If it doesn't pull it away, tourists here will soon affect the laying of the water diversion pipeline."

"So anxious?" Liu Mo'ang asked in surprise.

Sun Wei smiled bitterly and shook his head and said, "How about not being in a hurry? The order given above requires us to produce the first batch of mineral water before New Year's Day. How about you, I'm not in a hurry?"

"Before New Year's Day?" Liu Mo'ang was also shocked by this deadline, "I'll go, is this done?"

"You have to complete it even if you can't finish it! This is the order!" Sun Wei said with a firm look on his face, "Didn't you see that we are now in a 24-hour round?"

Liu Mo'ang knew that in order to build the water plant as soon as possible, he directly brought a battalion of engineers...

So Liu Mo'ang simply didn't say anything and whistled directly.

The loud whistle was heard far away, and soon, Bai Shi and Baozi ran over happily.

After hugging the two sons and slapped the dog's heads hard, Liu Mo'ang whispered: "Go, lead your friends there, don't play here in the future, do you know if you know?"

The two dogs nodded obediently, then ran towards the mountain, which made Sun Wei stunned.

"Can you two dogs really lead the snow leopard away?" Sun Wei asked with two eyes.

"It should be fine. The bun is almost there, but the white lion has a good relationship with the snow leopard. The snow leopard can be said to have been raised by the white lion since childhood."

Sun Wei shook his head and said nothing. There is a legend about steamed buns when he was looking at the water source that day, he had heard Liu Mo'ang say that since the mighty snow mastiff was coming out, it probably wouldn't be a big problem.

Sure enough, not long after, Sun Wei vaguely heard the sound of a dog on it and another very magical sound, and then he saw three black dots gathered together on it, one of which should be the snow leopard.

It seemed that after playing for a while, three black dots jumped toward the west and soon disappeared.

"Brother Sun, today I will arrange for people to build a platform to watch snow leopards in the west so that tourists will not come here."

"That's the best." Sun Wei also felt relieved.

"Brother Sun, is there any problem with food and accommodation?"

"No problem, you don't have to worry about this. If you need anything, I will say hello to you." Sun Wei said with a smile.

In fact, the construction of this mineral water plant is nominally a joint venture, but in fact, from the leveling of the site to the construction of the factory building and the installation of equipment, there is almost nothing Liu Mo'ang has to do. He only invested 200 million yuan to the construction of ordinary mineral water plant buildings and the introduction of equipment.

Sun Wei once said that the total investment of this mineral water plant is about 400 million yuan. Because it uses domestic mineral water production lines, the investment is much less. If it is used for imported production lines from abroad, this number will at least double.

Factory buildings are all made of steel structures. After all, the construction speed of steel structure factories is much higher than that of steel-concrete structures. Although the cost is higher, it is not a big problem for Liu Mo'ang. After all, the construction cost of factory construction is borne by the military, and Liu Mo'ang only needs to pay the materials and the production line.

In this way, Liu Mo'ang's actual expenditure is still much less.

On the plateau, the expensive construction costs are!

"Brother Sun, how is the routing survey of water diversion pipelines and heating pipelines?"

"The survey has been basically completed, and the pipeline will be laid in a few days." Sun Wei's face was filled with a satisfied look.

The three major parts of the mineral water plant are water sources, water diversion pipelines and production workshops. The construction of the production workshops has now been on track, and the water source is there, and the rest is the water diversion pipelines connecting the two.

The most difficult construction is the water diversion pipeline.

Because the altitude here is very high, the temperature is very low, and it is all rocks, so there is no way to keep the heat by burying it deeply. Moreover, the lake water temperature is very low, and in winter and spring, the thickness of the frozen lake surface is more than two meters. Therefore, in order to ensure that the mineral water plant can have water available 365 days a year, while laying the water diversion pipe, you also need to find a way to heat the drinking water pipe.

After discussion, the engineering designers decided to build a pipeline led from the hot spring lake while laying the water diversion pipeline, and use high-temperature hot spring water to heat the water diversion pipeline.

In addition, the mineral water plant also needs heating after it is built, so it is very necessary to bring a heating pipeline from the hot spring lake.

As long as the hot spring water is directed to the mineral water plant through pressurization, and then the wrong water diversion pump station is pressurized, then the hot spring water up to 70 to 80 degrees will enter the outer layer of the water diversion pipe, and the water diversion pipe is heated on the outer layer of the water diversion pipe to ensure that the water diversion pipe will not be frozen even when it is the coldest.

The straight-line distance from the hot spring lake to the mineral water plant is more than four kilometers. In addition to the length of the water diversion pipeline, this heating pipeline used for heating alone must be built for nearly nine kilometers. Two pressurization stations must be built in the middle to make the hot spring water to the pump station on the wrong lakeside.

Therefore, the construction of water diversion pipes and heating pipes for heating water diversion pipes is no less light than building a factory building.

Fortunately, building heating pipelines here is not as troublesome as in the city. Not only do you have to dig the road surface, but you also have to coordinate and communicate with departments such as communications, gas, and tap water. During construction, you have to be careful not to dig out other underground pipelines.

When construction is under construction, most of the heating pipes are wrapped with a thick insulation layer and just walk above the ground. There are crisscrossing artificial grassland watering trenches here. The heating pipes follow the watering trenches, and there is no need to worry about affecting the sowing and harvesting of the grassland. Only when passing through the road will you dig deep into the heating pipes to bury them.

After the heating pipeline is laid in the mineral water plant, there is no need to dig a trenches and bury them when going up. Just keep the heat insulated and go directly with the water diversion pipeline.

Laying water diversion pipes and heating pipes is not a very difficult task for engineers. The engineering battalion of the mineral water plant was constructed and divided into a company of soldiers and enough machinery to be used specifically for pipeline laying. It is estimated that after the civil engineering of the water plant is completed, the pipeline can be almost completed.
Chapter completed!
Prev Index    Favorite Next